ErgoTek product brochure 2022

Seite 6 Type: MBF-P 55/120 1Sp Drive: Three-phase asynchronous motor Positioning: Initiators Change time: ca. 1.5 s Cycle time: ca. 9 s Control system: S7-1200 | integrated into robot control Interlinking of two injection molding machines with two FlexiTek conveyors, five camera systems, assembly and laser station The task: Two injection molding machines are to be linked together and joined in the process. Before the components can be joined, they must be cooled to below 60°. Before and after each production step, the com- ponents are inspected via camera and sensors. After the subsequent laser marking, the components are packed in SLCs. The solution: Two accumulating FlexiTek conveyors are loaded with i.O. parts via robots for dynamic buffering of the components. Further robots assemble and transfer the components to indexing conveyor for laser marking. In addition, the i.O. parts are counted and transferred to the small load carriers. 6